VOYAGER
201' (61.26m) ASTILLEROS CELAYA
LOA: 201' (61.26m)
Beam: 31' (9.45m)
Draft: 15' 6" (4.72m)
Speed:
12.5 Knots
17 Knots
Location: Provence-Alpes-Cote-d'Azur France
Year: 1973
Builder: ASTILLEROS CELAYA
Type:
Motor Yacht
Price: ($9,202,421 USD est.)
€8,500,000 EUR
Additional Specifications For VOYAGER:
LOA: 201' (61.26m)
Beam: 31' (9.45m)
Max Draft: 15' 6" (4.72m)
Hull Material: Steel
Hull Designer: Sparkman & Stephens
Deck Material: Teak
Deck Material: Aluminum
Tonnage:
780.00
Range At Cruise: 8100
Speed:
Cruising 12.5 Knots
Max 17 Knots
Int Designer: Civitella Design
Ext Designer: Sparkman & Stephens
Fuel Capacity: 138910 L (36696.14 Gal)
Water Capacity: 55000 L (14529.46 Gal)
Flag: Panama
Location: Provence-Alpes-Cote-d'Azur, France
Price: ($9,202,421 USD est.)
€8,500,000 EUR
Delivery/Model Year: 1973
Year Built: 1973
Refit Year: 2020
Builder: ASTILLEROS CELAYA
Type:
Motor Yacht
Engines: 1125 HP,Twin, Diesel, Caterpillar, D399 Turbo,
Staterooms: 11
Sleeps: 22
Heads: 11
Crew Quarters: 12
Captain Cabin: Yes
Classifications:
N/A IRS PRIVATE
DETAILED DESCRIPTION
  1. MAIN CHARACTERISTICS

    TYPE
    • Displacement Motor Yacht
    BUILDER
    • Astilleros y Talleres Celaya S.A
    NAVAL ARCHITECT
    • Sparkman & Stephens #2034
    EXTERIOR DESIGN
    • Sparkman & Stephens #2034
    INTERIOR DESIGN
    • Civitella Design S.A.
    • New Cruise / Frank Neubelt, 2010
    YEAR
    • 1973
    REFIT
    • 2020-2017-2015-2012-2009-2005-2003-1985
    CALL SIGN
    • HO3191
    IMO
    • 8985957
    CLASSIFICATION
    • IRS Private
    CONSTRUCTION
    • Steel Hull, Aluminium Superstructure, Teak Decks
    CREW
    • 19
    FLAG
    • Panama
    ENGINES
    • 2 x 1,125 Hp Caterpillar D399 Turbo Diesel
    GT
    • 780
    NT
    • 234
    DISPLACEMENT
    • 855 tons
  2. DIMENSIONS

    LOA
    • 61.26m / 201’
    LWL
    • 53.09m / 174’
    BEAM
    • 9.45m / 31.2’
    DRAFT
    • 4.72m / 14’5’’
  3. SPEED & RANGE UNDER POWER

    MAXIMUM SPEED
    • 17 knots @ 1,100 rpm
    CRUISING SPEED
    • 12.5 knots @ 900 rpm
    FUEL CONSUMPTION
    • 3,500 litres / day @ 12 knots
    RANGE
    • 8,100 nm @ 12 knots
  4. CAPACITIES

    ACCOMMODATION
    • Up to 22 x Guests in 10 + 1 cabins
    CREW
    • Up to 19 x Crew in 12 cabins
    FUEL
    • 138,910 litres / 36,696 US gallons max
    FRESH WATER
    • 55,000 litres / 14,529 US gallons
    LUBE OIL
    • 1,740 litres / 460 US gallons
    DIRTY OIL
    • 1,000 litres / 264 US gallons
    GREY WATER
    • 10,340 litres / 2,731 US gallons
    BLACK WATER
    • 10,500 litres / 2,774 US gallons
    HELI JET FUEL TANK
    • 10,814 litres / 2,857 US gallons
  5. ACCOMMODATION

    • OWNER & GUESTS

      • 1 x Owner’s suite on upper deck
      • 2 x VIP cabins with en suites on lower deck aft
      • 2 x Double cabins with en suite bathroom on lower deck forward
      • 1 x Convertible cabin with en suite on lower deck aft
      • 2 x Double cabins with en suites on lower deck aft
      • 2 x Connecting Twin cabins on lower deck aft
      • 1 x Convertible sky lounge on upper deck (can be converted into a second Owner’s suite with en suite bathroom)
    • CREW

      • 1 x Captain’s cabin with en suite on main deck
      • 4 x Single cabins with en suite on main deck
      • 1 x Double cabin on main deck
      • 1 x Triple occupancy cabin with en suite on lower deck
      • 2 x Double occupancy cabins with en suite on lower deck
      • 2 x Double occupancy cabins on lower deck
      • 1 x Helicopter pilot’s cabin on lower deck aft
    • OWNER’S SUITE

      • 42 square metres finished in dark mahogany, king size bed, spacious living area, office area web access, private safe, 50’’ TV, six large windows; en suite bathroom with large hydro jet massage Jacuzzi. The Owner’s suite is accessible from both a private staircase connecting to the library and from outside with starboard and port direct access doors.
    • GUESTS CABINS

      • 2 x VIP cabins of 19 square metres on lower deck aft, finished in natural mahogany, king size bed, desk with phone and internet access, 43” TV, private safe, three large portholes, en suite bathroom with shower.

      • 2 x Double cabins of 18 square metres on lower deck forward, finished in bright white wood panelling with mahogany bezelling, queen size bed, desk with phone and internet access, hidden make-up table, fashionable stainless steel lighting, a 40” TV, private safe, three large portholes, en suite bathroom with shower. These cabins are accessible from a private staircase connecting to the library. Refurbished in 2020.

      • 1 x Convertible cabin of 13 square metres on lower deck aft, white wood panelling with bright pearl wall covering, king bed that can be split into two twin size beds, full stereo/DVD system with a 26 ” Sharp flat screen TV, book shelves with phone and internet access, private safe, three large portholes, en suite bathroom with shower.

      • 2 x Double cabins of 17 square metres with two connecting cabins on lower deck aft, wood panelling finished in refreshing yellow and white wall, queen size bed, living area that can be converted into a twin bed cabin for children, desk phone and internet access, full stereo / DVD system with two 26” TVs, private safe, three large portholes. En suite bathroom with shower. These double and twin cabins are accessible from a central hallway, which is connected to the main deck dining area via a staircase.
      • Small Guest Office on lower deck aft with desk accessories to work in privacy.
      • All lower cabins are accessible from a staircase connecting the main deck dining area.
    • SKY LOUNGE (Upper Deck)

      • This area can be converted into a very large yet elegant second Owner’s suite due to its drop down bed. 44 square metres full beam, finished in natural mahogany, white dome with colour-changing lighting, king size Murphy bed (totally imperceptible when pulled up and hidden in forward bulkhead), Persian style living area lavishly furnished with sofas and settees, table/office area with phone and internet access, private safe, mini bar, eight large windows, en suite bathroom with large hydro jet massage Jacuzzi forward. The sky lounge is accessible from a staircase connecting the dining area, it opens onto the upper sundeck with stainless steel sliding doors (usable manually and automatically) overlooking a spectacular panoramic view.
    • DINING AREA (Aft Upper Deck)

      • The aft dining area features an impressive teak dining table with seating for over 12 x Guests for al Fresco dining. Ample seating area with Dedon design lounge sofas and long chairs, wet bar with seating for 6 x Guests, spacious U-shaped seating area for over 14 x Guests, JL Audio sound system, barbecue facilities adjacent to the dining area.
    • DINING ROOM (Main Deck)

      • Finished with light sand accent wood panelling, seats up to 18 x Guests at 2 antique wood tables; the round table for more intimate dining for 6 and the large rectangle table for more than 12 x Guests. The elegant spacious dining area has a disk Yamaha baby grand piano, 400-bottle capacity wine cellar and is peppered with burgundy Nautilus design dining chairs. Christofle silver flat ware, Bernardaud Limoges fine porcelain and Riedel crystal glasses are delicately aligned, protected by custom made drawers and cabinets.
    • BAR (Main Deck)

      • Finished with light sand accent wood panelling, L-shaped lit counter bar topped with black granite, curvy shape sink. 4 x Wooden bar seats, a small couch and an L-shaped couch. An invitation for an entertaining evening with practical storage including large capacity refrigerator, extensive custom made cabinet displays for alcohol decanters and cabinets for glasses. A 40” Sony flat screen TV is on the forward wall. Doors lead out to the aft deck.
    • SEATING (Aft Main Deck)

      • The aft consists of an intimate and comfortable seating area around coffee tables and a staircase going up to the upper deck, plus a shower.
    • LIBRARY (Main Deck)

      • Finished in natural mahogany, with extensive shelving for a selection of books, DVDs, CDs and games. Location of the Media Max and Plex servers with almost unlimited storage capacity of DVDs, CDs, and photographs. Furnished with game table and 4 x lounge chairs.
    • MEDIA ROOM (Midship Main Deck)

      • Finished with light sand accent wood panelling, fully equipped with very large LG 47” LCD flat screen TV, Game consoles, complete independent theatre sound system and video game station. There is a large comfortable sofa arrangement to seat up to 10 x Guests.
    • WHEELHOUSE (Bridge Deck)

      • Smoked oak hardwood floor, herring bone pattern oak deck head, bulkheads covered with black Tabu bird’s eye maple panelling. Console, chart table, desk, and cabinets hand milled from solid oak, carefully detailed with touches of gold and lightly padded with Italian black leather on top. Black and stainless steel adjustable captain’s chair with a similar double one for the guests in this warm and appealing wheelhouse. Forward facing with double insulated tempered glass to reduce heat and prevent fogging. Access is by a staircase coming from the crew dining area and the library plus starboard and port direct access doors.
    • GARAGE

      • Rebuilt in 2020. 17 square metres, finished with stainless steel ceiling and wall panelling, large equipment and toy storage area, 6 x large portholes, roller door on port side, 2 x Working desks, compressed air and hydraulics connection.
  6. MECHANICAL EQUIPMENT

    ENGINES
    • 2 x 1,125Hp Caterpillar D399 Turbo Diesel
    ENGINE HOURS
    • As of 12th October 2020:
    • Port: 6,979 / Stbd: 6,879 hours
    • Both engines were rebuilt in July 2002 logging 2,400 hours at that time
    GEARBOX
    • 2 x 3.5:1 reserve reduction gear boxes
    PROPULSION
    • Air control
    PROPELLERS
    • 2 x Steel propeller shafts based in Ermaksan rubber bearings
    • 2 x 3-blade bronze fixed pitch propellers
    RUDDER ANGLE
    • 45 degrees; hydraulic
    STABILISERS
    • Naiad (last overhaul 2020)
    BOW THRUSTER
    • 160 bhp Plueger fixed pitch 3-speed electronically controlled
    GENERATORS
    • 2 x 275Kva D343 Caterpillar auxiliary 440V AC 60Hz
    GENERATOR HOURS
    • As of 12th October 2020:
    • Port: 50,183 hours / Stbd: 49,402 hours
    • Both generators were rebuilt in July 2002 logging 33,300 hours
    ELECTRICITY
    • Electrical system completely redone & upgraded 440V / 220V / 110V, 60Hz
    SHORE POWER
    • 440V 3 Phase ENAG, 60Hz 120kW
    BATTERIES
    • 6 x 12V / Ampere hours gel cell
    MAIN ENGINE STARTER
    • Air propulsion
    GENERATOR STARTER CHARGERS
    • 180 ampere hours; 12V x 2 x 2
    CONVERTERS
    • ENAG 220V and 110V
    EMERGENCY GENERATOR
    • 1 x 40kW Perkins Diesel 440V AC 60Hz
    AIR CONDITIONING
    • 2 × 25-ton Carrier compressor water chillers A/C through separate air handlers for each room, air handlers with electric heat
    WATERMAKER
    • 2 x FSM with 6,048 litres capacity per day
    TOILET SYSTEM
    • Vacuum system by EVAC
    SEWAGE SYSTEM
    • Hamann HL Cont. Plus 25 (new in 2020)
    FUEL SEPARATOR
    • Alfa Laval MIB 303 (new in 2020)
    WASTE DISPOSAL
    • 2 x Franke TE50 waste disposal (new in 2020)
    OIL / WATER SEPARATOR
    • 115 Ppm DVZ 500 FS4 (new in 2020)
    • Hamann GS 025 galley separator (new in 2020)
    FIRE / BILGE PUMP
    • Bell & Gossett 1531; 1”1/4; 100GPM Itur AU60
    COMPRESSORS
    • 2 x Quincy Model 325-104
  7. COMMUNICATION EQUIPMENT

    SATCOM
    • 1 x Inmarsat C Satcom
    VHF
    • 1 x Furuno FM8500 comes with DSC
    • 1 x Icon IC A110
    • 1 x Sailor SP3520 (emergency VHF)
    • 1 x Furuno FS1570C MH/HF Radio
    • 1 x GMDSS/ACR 2726 hand held radio
    INTERIOR UHF
    • 20 x Hytera
    SHIP SECURITY ALERT SYSTEM
    • 1 x Furuno Falcon 15
    LOUDHAILER
    • 3 x Standard
    TELEPHONE EXCHANGE
    • PABX Panasonic KX T 7630
    VSAT
    • KNS 100cm dish
    TV-SAT
    • KVH Track Vision HD 11
    WIFI
    • Starlink
  8. DECK EQUIPMENT

    ANCHOR WINDLASSES
    • Overhauled 2019
    AFT WARPING CAPSTANS
    • Overhauled 2020
    ANCHORS
    • 2 x Galvanised 500kg (new in 2020)
    ANCHOR CHAINS
    • 1 x Port 150m / 1 x Stbd 205m
    BOAT CRANE & DAVITS
    • 1 x Davit for 1 ton, 1 x bow for 500kg
    • 1 x Helipad Hidrokon HK24 10.46m x 1.5 tons at 8.5m - 3.5 tons at 4.5m (new in 2020)
    PASSERELLE
    • Besenzoni
    SIDE BOARDING
    • Hydraulic step system Bronzoni (new in 2012)
    POOL / JACUZZI
    • Intex stowable
  9. ENTERTAINMENT EQUIPMENT

    TV / DVD
    • Plex Server; Apple TV
    MUSIC SYSTEM
    • Sonos Wireless
    MAIN DECK
    • Marantz SR5500 12 speaker
    • SRS circle surround II
    • Elan digital power amplifier
    • DTS 96/24
    • ADA multi room preamplifier
    UPPER DECK
    • JL audio sound system
    • 6 x Speakers
    DJ SET
    • Mixer Pioneer Recordbox XDJ-R1
    • 1 x Subwoofer
    • 1 x Amplifier
    • 4 x Speakers
    GYM
    • 2 x Go-cycle electric bicycle and helmets, various gym equipment
  10. GALLEY & LAUNDRY EQUIPMENT

    • GALLEY

      • High tech stainless steel design
      • Compliant with the strict USPH regulations for kitchen and food preparation facilities
      • All equipment installed is of commercial grade quality
      • Large enough for a chef and several sous-chefs for big parties
      • Fireproof and watertight doors
      • Bulkheads and deck heads are now A60 fireproof
      • 1 x Dishwashing area
      • 1 x Coffee station area
      • 1 x Temperature controlled 400-bottle wine cellar in dining room
      • 1 x Walk-in coolers & freezers stainless steel (Autonomy: several weeks @ sea)
      • 1 x Dry storage room for food
      • 3 x Deep sinks, stainless steel
      • 1 x Work Island with folding leaves, stainless steel
      • 1 x Copious amounts of stainless steel shelving throughout the galley
      • 1 x Galley bulkheads: stainless steel
      • 1 x Galley deck heads: stainless steel w/ bright yellow powder coated
      • Aluminium floating deck head
      • Flooring; anti-skid commercial 2”x 2” tiling
      • 2 x True Refrigerators T-23-2 stand up double Dutch door, stainless steel
      • 1 x True freezer under counter TUC-27f, stainless steel
      • 1 x True cold table in counter TSSU 48-8, stainless steel
      • 1 x Garland Range S-684, 10 electric burners on top, 2 ovens below stainless steel
      • 1 x Garland salamander, SERC, stainless steel
      • 1 x Garland convection oven, MCO-E-5/25 master half size, stainless steel
      • 1 x Hobart dishwasher sanitizer ml-27873 sr24h, stainless steel
      • 1 x Hoshizak Ice Maker, KM-250BAE cubes, up to 230lbs / 24 hrs / in pantry + 1 x Powmer / 1 x Migel
      • 3 x Insinkerator garbage disposal SS-50 manual reversing
      • 1 x La Cimbali M29 select espresso machine, stainless steel
      • 1 x Industrial sound proofed mixer and blender, stainless steel
      • 1 x Industrial smoking machine, stainless steel
      • 1 x Industrial sorbet and ice cream machine
      • 1 x Industrial sound proofed robot, stainless steel
      • 1 x Industrial steam machine, stainless steel
      • 1 x Industrial rice cooking machine, stainless steel
      • 2 x Bunn coffee makers, stainless steel
      • 1 x Charbroil BBQ, 3 burners and a side burner, stainless steel
      • 1 x Breville toast machine
      • 1 x Dualit toaster
      • 1 x Breville kettle machine
      • 1 x Nespresso coffee machine
      • 1 x Magimix coffee machine
      • 1 x Nilfish vacuum cleaner
      • 1 x Neosystem DV 53 dishwasher
    • PANTRY

      • Dry stores walk-in pantry below the galley 7’×14’×7’ with extensive modular shelving, flooring with anti-skid commercial 2’x 2’rubber dot tiles
      • Freezer-and-cooler combo walk-in 7’×14’×7’ stainless steel, bondable stores in cooler area, shelving throughout, stainless steel floor and deck head
    • LAUNDRY

      • Extensive laundry facility refurbished and re-equipped during 2020 refit
      • Located in the crew area forward on the lower deck allowing a quiet, removed but still easily accessible space where copious amounts of laundry can be cleaned and pressed day or night
      • Flooring with anti-skid commercial marine 2”x 2” tiles
      • 3 x Miele W3033 washing machines
      • 3 x Miele T8013C dryers
  11. SECURITY & SAFETY EQUIPMENT

    SECURITY
    • 16 x Colour cameras throughout
    • Camearas can record & save up to 30 days of filming on hard disk

    SAFETY
    • 1 x EPIRB Ocean Signal E100
    • 6 x Emergency rafts, SOLAS compliant
    • 43 x Life jackets and immersion suits
    • 1 x Whistle controller Kahlenberg M-511A
    • 1 x Teel self-prime emergency bilge pump with Baldor motor
    • 1 x Integrated Westinghouse / ITUR bilge pump with Baldor motor
    • 1 x Westinghouse / ITUR ballast pump with Baldor motor

    FIRE FIGHTING
    • 1 x Notifier AFP-200 fire detection and alarm system
    • New fire detection system with smoke & heat detectors throughout ship (2020)
    • Main fire pump, Bell& Gossitt with Baldor motor
  12. TENDER & WATERSPORTS EQUIPMENT

    TENDER
    • 1 x 22'4’’ Mako 680 with 200Hp Suzuki outboard

    WATERSPORTS
    • 1 x Sea Doo 3 person waverunner Jetski
    • 1 x Wakeboard
    • 3 x Pair water skis including slalom and mono
    • 2 x Airhead super slice
    • 2 x Paddling Jacuzzi inflatable pool
    • 1 x Water bed
    • 2 x Banana boat
    • 2 x Nautibuoy inflatable docks
    • 1 x Inflatable Aquapark with:
    • 1 x 6m Trampoline, 1 x Pyramid and 1 x Slide
    • 1 x Inflatable sailing boat
    • 1 x Twin kayak
    • 1 x Single kayak
    • 2 x BIC inflatable paddle board
    • 10 x Recreational games and various rackets

    DIVING EQUIPMENT
    • 19 x Goggles
    • 11 x Diving fins
    • 14 x Diving shoes
    • 16 x Diving suits (incl. child)
    • 25 x Lead weights
    • 6 x Diving tube
    • 3 x Dive compressors
    • 2 x Power dive floating dive compressors
    • 1 x Garrett sea hunter mark II

    FISHING EQUIPMENT
    • 7 x Fishing rods and assorted tackle
    • 1 x Ocean Devil fishing gear
  13. REFIT & MAINTENANCE NOTES

    • WORKS SORTED BY EQUIPMENT 2021/2023

      • PORT MAIN ENGINE

        • 2021:

          • RHR’s counter changed
          • Oil/Filters changed
          • Fuel Filters changed
          • Governor repaired
          • 2,000RHR’s Service
        • 2022:

          • @7,406 – Zink anodes replaced
          • Coolant pump overhauled
          • Fuel supply line changed to SS
          • LO/Coolant analyses
          • Boroscopic Examination (MPT)
          • 2,000RHR’s Service by MPT
          • Air Starting motor replaced
        • 2023:

          • FO pressure gauge changed
          • SW pressure gauge changed
          • LO in starting motor changed
          • FO filters replaced
      • STBD MAIN ENGINE

        • 2021:

          • RHR’s counter changed
          • Oil pressure sensor changed
          • 2,000RHR’s maintenance
          • 500RHR’s Maintenance
        • 2022:

          • Zink Anodes Replaced
          • Fuel supply line replaced with SS line
          • LO/Coolant analysis
          • Baroscopic Examination
          • 2,000RHR’s Service by MPT
        • 2023:

          • FO Pressure gauge changed
          • FO pressure alarm sensor changed
          • SW pressure gauge changed
          • LO replaced in starting motor
          • FO filters replaced
      • PORT GENERATOR

        • 2021:

          • RHR’s Counter changed
          • Air Filter changed
          • Starting Motor changed
          • 2,000RHR’s service completed
          • Vibration dampeners changed
        • 2022:

          • New turbocharger
          • LO and Coolant analyses
          • Boroscopic examination
          • 2,000RHR’s service done by MPT
        • 2023:

          • FO and Cooling water pressure gauges changed
          • Drive shaft end cover gasket replaced
          • Oil Filter covers gaskets replaced
          • 250RHR’s service
          • New Starting batteries installed
      • STBD GENERATOR

        • 2021:

          • RHR’s counter changed
          • Vibration dampeners changed
          • FW heat exchanger cleaned
          • 2,000RHR’s Service
          • Piston rings renewed
          • Load test completed
        • 2022:

          • Zink anodes replaced
          • New turbocharger installed
          • LO and Coolant analyese
          • Boroscopic examination
          • 2,000RHR’s service by MPT
        • 2023:

          • FO and Coolant pressure gauges changed
          • Exhaust gas elbow welded
          • LO changed, breather changed
          • 250RHR’s service completed
          • Starting motor replaced
          • New starting batteries installed
      • EMERGENCY GENERATOR

        • 2021:

          • Monthly test runs
          • Test under Load
        • 2022:

          • Monthly test runs
        • 2023:

          • Weekly/Monthly test runs
          • Test under Load
      • GEARBOXES

        • 2021:

          • Filters cleaned
        • 2023:

          • 13/03/2023 Port at 7,583 LO changed, gear box inspected
          • 13/03/2023 Stbd at 7,495 LO changed, gear box inspected
      • SHAFTS

        • 2021:

          • Greasing completed
        • 2022:

          • Gland packings replaced on both shafts
          • Sensors on the bearings inspected, cleaned, calibrated
        • 2023:

          • Greasing of the bearings
          • STBD Shaft greasing bearing changed
          • New shaft bearings temperature monitoring system Via new AMS and New PLC
          • New Shafts LO filling system installed (not necessary to go to shaft tunnels to fill the bearings with oil)
      • RUDDER & STEERING GEAR

        • 2021:

          • Hydraulic filters renewed
          • New cut-off valves installed
          • Oil replaced
          • Rudder gland packing changed
        • 2023:

          • Rudder compartment inspection and cleaning
          • New lights installed
          • Greasing done on regular basis
      • GANGWAY

        • 2021:

          • Hydraulic hoses replaced
          • Sensor changed
        • 2022:

          • Lights installation
          • Ram overhaul
        • 2023:

          • All hydraulic hoses changed
          • Oil changed
      • PASSARELLE

        • 2021:

          • Hydraulic hatch, cylinders maintenance
        • 2022:

          • Hydraulic hose replaced
        • 2023:

          • Control cable grounded wire fixed
          • Aft hatch oil added
          • Passarelle overhaul by Monaco Marine
          • Oil replaced
      • STABILISERS

        • 2021:

          • Hydraulic system maintenance
          • Hydraulic oil and filters replaced
          • Hydraulic cylinders maintenance
          • New monitoring screen on bridge installed
          • Nitrogen cylinder checked
          • Greasing
        • 2022:

          • New Screen Nayad operational screen
          • Hydraulic system maintenance
          • New hydraulic pump
          • Re-charge bladder with nitrogen
          • Cooler overhaul
      • HVAC

        • 2021:

          • Air filters cleaned / replaced
          • Chef Cabin AC line fixed
        • 2022:

          • Valve on condenser changed
          • Fancoils cleaned
          • Duct Sanitizing and cleaning
        • 2023:

          • Condensers of chillers cleaned
          • All AHU and Fan coils cleaned, filters replaced, GelAir replaced
          • New AC unit for cooling of Shore power invertors installed
          • AFT and FWD chillers, maintenance, gas replacement adjusted by AC Cleaner Monaco
          • Air Filters replaced
      • ALFA-LAVAL

        • 2022:

          • Test run done in November
          • Test run done in December
        • 2023:

          • Purifier bowl and discs cleaned
          • Purifier in use after every refilling of the Day tank
      • PROVISION PLANT

        • 2021:

          • Regular maintenance
          • SW pumps maintenance
          • Additional SW cooling pump installed
          • Maintenance completed by service
        • 2022:

          • New SW pumps installed
          • General inspections
        • 2023:

          • Regular inspections of the Freon and SW cooling system, evaporators cleaned
          • Regular SW filter cleaning
          • Freon added to Cool Chamber system
          • New cooling fan for the compressors
      • HELIFUEL REFUELING MODULE

        • 2021:

          • Pump test ok
        • 2022:

          • Test of pump
          • New Transfer pump (received)
      • HELI FUEL TANKS (2 x 5,000 litres each)

        • 2022:

          • Tanks cleaned
        • 2023:

          • Port Heli Fuel Tank disconnected from Heli Fuel System (Monaco Marine) to prepare conversion of 1 x tank to tender fuel tank
      • BAUER SCUBA COMPRESSOR

        • 2021:

          • Air Filter changed
        • 2023:

          • El motor cleaned
          • Compressor service completed
      • STARTING AIR COMPRESSORS

        • 2021:

          • Air Compressors Maintenance
          • Em Air Compressor connected to Emergency Generator
        • 2023:

          • Pressure gauges replaced on AFD and AFT Compressors
          • FWD air compressor Oil and filters changed
          • Aft air compressor Oil and Filters changed
      • WATER MAKERS

        • 2021:

          • 2 x New installed
          • Regular Maintenance
        • 2022:

          • System inspection by Service
        • 2023:

          • Regular Maintenance as per manual
          • Filters replaced several times
      • DOMESTIC WATER PUMPS

        • 2021:

          • Pumps inspection
        • 2022:

          • Pumps Inspection
        • 2023:

          • New hot water pump installed
          • Pumps greased on regular basis
      • DOMESTIC WATER FILTERS

        • 2021-2023:

          • Filters replaced on regular basis, depending on FW consumption and water quality
      • FW TANKS

        • 2021:

          • Tanks repainted
          • Tanks 7 cleaned
        • 2022:

          • Manhole gaskets changed
        • 2023:

          • FW system full treatment with Octomarine
          • All tanks inspected
          • New manhole installed on tank 8
          • New Hydrophore tank installed (Warem / 150ltr)
      • HULL & BALLAST TANKS

        • 2022:

          • Ballast tank 1 (Void 1) Rebuilt and Repainted
          • Ballast tank 8 (FW tank 8) Cleaned treated with Belzona, Repainted
          • Cofferdam 3 inspection Filled with Solid ballast
        • 2023:

          • Ballast tank 9 inspection
          • Ballast tank 1 inspection
          • Ballast tank 2 inspection
          • Cofferdam 3 Inspection
          • Cofferdam 4 inspection
          • Cofferdam 5 inspection
          • LO Storage tank - Inspected, cleaned painted
      • AIR HANDLERS / FCU

        • 2021:

          • Crew fans el motors renewed
          • STBD AHU el motor and solenoid valve replaced
        • 2022:

          • Air Filters changed
          • Port AHU Electrical jobs carried out
        • 2023:

          • All AHU and FCU cleaned
      • SEA CHEST

        • 2023:

          • Ship side valves replaced
          • Distance sleeves repaired
          • Cleaned on regular basis
      • BALLAST

        • 2023:

          • Ballast system decommissioned
          • Ballast pump in use as bilge pump
          • Regular greasing done on the pumps
          • Ballast system decommissioned (pipes and valves removed)
      • BILGE SYSTEM

        • 2023:

          • New bilge system implemented with new sensors, remotely controlled valves by Monaco Marine, all studies done by Class and Naval Architect
          • Heli Fuel tank converted to Bilge tank
          • New Control panel installed
          • Pumps greased on a regular basis
      • FIRE PUMPS

        • 2021-2023:

          • Regular pumps test
          • Regular pumps greasing
      • HAMMAN & BLACK WATER

        • 2021:

          • Discharge pump overhauled
          • Hamman SW pump overhaled
          • Vac. jet pumps Overhaul
          • Black water vac tank cleaned
          • Back water sludge tank suction line replaced
          • Tanks level sensor replaced
        • 2022:

          • Grease trap cleaned
          • 3 x Hamman pumps overhauled
          • Sensor replaced
        • 2023:

          • Vac. Pumps cleaned
          • System tested / in use
      • BOW THRUSTER

        • 2021:

          • Tested, all ok
        • 2023:

          • LO changed
          • LO tank cleaned
          • New oil added
      • OILY WATER SEPARATOR

        • 2023:

          • Mech Seal on pump changed
          • 15PPM monitoring equipment maintenance
          • Reconnection to new bilge system completed under warranty in 10-2023
      • FIREALARM MONITORING PANEL

        • 2021:

          • Sensor replaced
          • Connected to General Alarm
        • 2022:

          • Tone Generator replaced
        • 2023:

          • Emergency power supply restored
      • RAY GLASS PROTECTOR 8.50M TENDER

        • 2021:

          • Technomare maintenance
          • Tubular repair on bow
          • Suzuki software update
          • Sound speakers replaced
          • Installation of bilge pump
          • 2 x Suzuki standard maintenance
          • STBD Engine Fuel pump maintenance
        • 2023:

          • Technomare Service
          • Fuel Pre Filters replaced, STBD Engine hand fuel pump installed
      • MACO 68 TENDER

        • 2021:

          • Fuel Gauge replaced
          • New Depth Sounder
          • New Radio
          • Bilge Pump installed
          • Fuel Level indication added
          • Music system added
          • Gear box replacement
        • 2022:

          • Full service
        • 2023:

          • Test Run
          • New battery terminals
          • New Batteries
          • Main Fuse
          • Tilting unit
          • Clutch FWD AFT sensor

      • WATERSPORTS EQUIPMENT

        • 2023:

          • 2 x New smaller tenders (incl 1 x SOLAS)
          • (3 x Jetskis on board)
          • New Seadoo Trix JetSki
          • New Jet SurfBoard
          • Old Seadoo complete restauration
        • 2022:

          • New Seadoo Trix JetSki
      • PORT DAVIT

        • 2022:

          • New brake
      • ANCHORS

        • 2019:

          • Renew both Anchors
      • MAIN CRANE

        • 2022:

          • Wires and wire drums replaced
          • Main control valve replaced
      • WINE CELLAR

        • 2021:

          • New cooling unit
        • 2022:

          • Service of unit
        • 2023:

          • New cooling unit installed
      • OTHER EQUIPMENT

        • 2023:

          • Galley fridges gasket replaced
          • Galley fridges, FWD and New compressors
          • New ice makers
          • New fan for bar fridge
          • Steam shower Master Cabin
          • New SONOS bars in Master, Media and Bar
          • New TV Media room and Bar
          • New work stations, Chief Engineer, Chief Officer, Captain and Chief Stew
          • Megger test
          • Starlink installed
    • REFIT 2019 / 2020

      • The primary objective of this 18 months refit was to maintain and repaint the hull and superstructure. Shafts were removed and shaft beds rebuilt in order to obtain higher cruise speeds and meet the original Sparkman Stephens design. All technical units were overhauled and upgraded where necessary to meet class standards. One of the davits was replaced with a new crane and it superstructure foundation to enable high lift capability of 1.5 tonnes at 10.5m and up to 2.4 tonnes at 6.4m to enable seaplane operations or any other lifting requirement. All interiors were refreshed where necessary and the aft sky lounge deck was replaced with a new aft seating area and a larger bar.

      • 10.46m x 1.5 ton Hidrokon crane installed on upper deck including all hydraulic systems, steel superstructure and foundations to support crane from lower decks
      • 17 square metres garage area with stainless steel closets and ceilings
      • Lower deck forward VIP Cabins fully dismantled and all the panels, beds & ceilings renewed
      • Lower deck forward VIP Cabin access stairs repaired with new wood
      • Lower deck forward VIP Cabin electrical system and pipe system renewed
      • Forward hull steel plate renewed
      • Forward hull anchor eyes configured
      • Forward hull anchor eyes plated with stainless steel
      • 2 x New galvanised anchors for port and starboard
      • New TV satellite antenna (KVH Track Vision HD 11) installed
      • New ANSCHUIL digital gyro STD 22 installed
      • AYKOP PT100 engine to bridge monitoring system installed
      • CCTV screen replaced
      • 16 x Cameras of CCTV replaced
      • All steel plates of lower deck crew area floor renewed
      • All rooms of lower deck crew area rebuilt with insulated stainless steel panelling
      • All pipes renewed
      • Electrical system and fire detection system in lower deck crew area renewed
      • All ceramics of lower deck crew area bathrooms renewed
      • All furniture of lower deck crew area renewed
      • Windlass dismantled and windlass foundation renewed
      • Garbage disposal system installed in the galley
      • Galley dishwasher replaced with Neosystem DV 53
      • Installed new sliding doors to skylounge aft
      • Upper deck starboard side davit dismantled and removed to make way for new terrace
      • Teak floor laid on upper deck starboard sides
      • New steel handrail installed on upper deck starboard side
      • Automatic roller door installed on upper deck port side
      • Upper deck aft bar extended
      • Upper deck aft old Jacuzzi replaced by new teak
      • Sun bed area replaced
      • Upper deck aft bar counter and L-shaped counter renewed with Corian
      • Installed new professional sound system on upper deck aft
      • Upper deck aft ceiling renewed and painted
      • Upper deck aft ceiling lights replaced with marine type stainless steel LED lights
      • U-shaped fiberglass fixed seating for 18 people installed on upper deck aft area
      • New cushions manufactured for the U-shaped seating
      • Master cabin bathroom panelling repaired
      • Dining room and bar ceilings painted and ceiling frames renewed
      • Sky lounge dome renewed and painted in white
      • Installed lighting on sky lounge dome
      • Sky lounge aft left and right portholes renewed
      • S-shaped stairs from main deck aft to upper deck aft removed
      • New stairs with steel construction, teak steps and LED lights installed on aft main deck and upper deck
      • 3 x Stainless steel windlasses built in main deck aft
      • Tank numbers.1, 2, 4, 7 and 8 cleaned with sand blasting and painted
      • 600 x Square metres of the top coat hull painted and 150 x square metres retouched from bare metal
      • Rope eyes on the hull framed with stainless steel
      • Main deck, upper deck, forecastle teak handrails sanded, painted in dark brown and varnished
      • 345 x Square metres of superstructure painted
      • Underwater hull sanded with high pressure water and antifouling paint applied
      • All the zinc in underwater hull renewed
      • Pipework for new DVZ, Hamman and Alfa Laval installed
      • New sewage treatment plant (Hamman) installed
      • New fuel purifier (Alfa Laval) installed
      • Shaft alignment corrected by rebuilding shaft beds
      • Tail shaft dismantled
      • Crack test applied on tail shaft
      • Dismantled and inspected the propellers
      • Crack test applied on the propellers – found in good condition
      • Propeller shaft dismantled and bearings renewed, 1 x bearing installed to the system
      • Main engine serviced
      • 2 x Generators serviced
      • Air conditioning system serviced
      • Watermaker system serviced
      • Bilge well cleaned and painted
      • 2 x Main engine and 2 x Generators painted in white
      • Engine room insulations renewed
      • Engine and generator pipes covered with stainless steel
      • Engine room floor panel anodized and painted with static paint
      • Engine room fan renewed and made soundproof
      • Main switchboard covers maintained and painted
      • Meger test applied
      • Main switch and engine room line labelled and switches renewed
      • 6 x Pieces of cooper line valves renewed in freshwater system collector line
      • New piping to garage installed
      • Engine workshop painted and new portholes installed
      • Sewage pump serviced
      • Shaft way cleaned and painted
      • Stabiliser’s both side bearings and seals renewed
      • Both engines 4 + 4 pcs intermediate shaft and all bearings dismantled, inspected – found in good condition, installed back and re-aligned
      • A/C system compressor and chiller system serviced
      • Ship’s horn repaired and covered with stainless steel
      • Helicopter fuel station serviced
      • 4 x Pieces of A/C pumps dismantled, repaired, and reinstalled
      • PTS and SBS funnels fan houses and fans repaired, silencers added to reduce noise
      • Helideck aft mast deconstructed
      • Helideck emergency generator’s batteries renewed
      • New ship insignia on funnel with stainless steel and LED lighting
      • Rudder system serviced
      • Evac converter system serviced
      • AIS antenna replaced
      • SSAS antenna replaced
      • Maxisea ECDIS system installed
      • Autopilot serviced
      • 100. New oily water separator (DVZ 500) installed
      • Main deck aft passarelle serviced, handrail chocks manufactured and installed
      • Passerelle teak floor renewed
      • Hidden shower installed on main deck aft
      • Main deck starboard gangway serviced
      • Stainless steel cover installed on main deck starboard gangway
      • Stairs from main deck to upper deck painted and floored with teak
      • Main deck side and aft wood ceilings renewed
      • All the lights in main deck ceiling replaced with marine type LED lights
      • New forward mast installed at forecastle area
      • New forward mast navigation lights cabled and installed
      • Chain cleaning system renewed
      • Main deck crew area starboard and crew rooms furniture renewed
      • Crew beds renewed
      • Jet-ski yellow seat cover renewed
      • Port and starboard stairs from upper deck to bridge renewed with teak steps
      • Upper deck SB and PT side old fashioned aluminium lights renewed with s/s lights
      • 3 x Washing machines and 3 x Dryers overhauled
      • Bowthruster and relevant electrical system serviced and repaired or replaced
      • Helideck painted and sanded
      • Helideck forward storage area white covers renewed
      • Wing remote control panels serviced and polished
      • Teak floor upper deck repaired
      • Tender and engine overhauled and serviced
    • REFIT 2017

      • Port and Starboard side boards paint renewed
      • 6 x Helideck chrome rail units repaired
      • Main deck and upper deck teak repaired
      • Cracks on the flare of ship’s bow repaired and painted
      • Aft passerelle hatch repaired
      • Bridge windshield renewed
      • All over teak capping rail dismantled, foundation maintained, reinstalled and re-varnished
      • Bottom hull spelters renewed
      • All porthole rubbers renewed
      • All guest cabin bathroom sinks galvanised
      • Hull inspected out of water with selected hull repairs
      • Underwater hull anti-fouling renewed
      • Engine shafts dismantled and maintained
      • Anchor hose pipes scraped and painted
      • Anchor and the whole chain galvanised
      • Anchor locker fixed
      • Crew cabin 101 re-furnished
      • Forward windlass serviced
      • Davit system pulleys repaired, gears replaced
      • Guests & Crew porthole blinds dismantled re-painted, gaskets renewed
      • Compass deck scraped and painted
      • All safety equipment serviced
      • Bridge navigation AID equipment serviced
      • Stabiliser serviced
      • Compressor air valve serviced, new compressor assembled
      • All air conditioner units serviced, filters replaced
      • Engine room fan contactors replaced, frequency converters moved to aft
      • Service air pressure reducing valve removed and overhauled
      • Forward air conditioner compressor and electrical engine block serviced
      • Electrical starter engine in the air conditioner compressor system renewed
      • Governor (main engine fuel control system) serviced
      • Fuel transfer pump of the starboard side main engines partially replaced
      • Fuel injection valve nozzles of the port and starboard side generators replaced
      • Helicopter fuel pump disassembled and serviced
      • Jet ski lift overhauled
      • Air conditioner digital temperature controller device installed
      • Starboard shaft 2 x Pieces of coupling, no 3 and no 4 bearing case caps removed and placed into correct limits and position
      • Both aft shafts on port and starboard pulled out and realigned
      • Hole placed on the frame between the grey water tank and the cofferdam to increase the grey water capacity tank by 50%, Cofferdam added in to the grey water tank
      • New emergency compressor mounted in the engine room, Safety fuse and pressostat installed for automatic control
    • REFIT 2015

      • Aft deck extended by 2.4m at sky lounge level, giving 13m2 extra deck space
      • New Jacuzzi bar and sun lounge area installed on extended aft deck
      • Teak decks renewed on bridge deck, boat and main decks
      • All the furniture and floor varnished in the Owner’s suite
      • Generator 10-year survey, conducted inspection and relevant works
      • New frequency convertor box in engine room for adjusting engine room fans rpm
      • Air condition compressor overhauled
      • Stainless steel anchor plates installed
      • New Helideck post and covers
      • Helideck landing lights and camera renewed
      • Windlass brakes renewed
      • New VSAT internet installed
      • Fuel pumps renewed
      • Jet ski crane electric motor dismounted and repaired
      • Fresh water tank no. 8 repaired
      • Air handler fans filters renewed
      • 2 x New hour metres mounted for port and starboard generators
      • Engine room electrical boxes cleaned and connections checked
      • Vacuum pump no. 2 renewed
      • Main engines serviced
      • Significant maintenance works on both generators serviced
  14. COMMENTS

    The 61.26m displacement yacht VOYAGER is now offered for sale. A great opportunity to buy a classic steel-hulled yacht which has been fully updated for 21st-century living, she would also be a fantastic support vessel.

    Built in 1973, VOYAGER yacht’s naval architecture and timeless exterior design is by Sparkman & Stephens, with interiors by Civitella Design S.A and New Cruise / Frank Neubelt that feature lots of natural wood and light throughout, plus no shortage of inviting spaces in which to socialise or chill out.

    VOYAGER has just undergone a thorough 18 months technical and mechanical refit which included an overhaul and service of all mechanical components together with a hull and superstructure respray and a cosmetic refurbishment of the interior.

    VOYAGER yacht can accommodate 22 guests across 10 + 1 cabins, with a large Owner’s suite finished in dark mahogany located on upper deck and the option for the sky lounge to convert to a second very elegant Owner’s suite.

    The rest of the accommodation is spread out across the lower deck and includes two VIP cabins, four doubles, two connecting twin cabins and a convertible. There is also room for 19 crew on board.

    In addition, VOYAGER yacht comes with a large Canadian coast guard certified helipad with refueling station to ensure guests can arrive and depart effortlessly, wherever you are in the world.

    Powered by twin 1,125 hp D399 Caterpillar diesel engines, VOYAGER yacht has a top speed of 17 knots and cruises at 12.5 knots. She has an ocean-crossing range of 8,000nm at 12 knots.

    • KEY FEATURES

      • Timeless classic lines by Sparkman & Stephens
      • Just completed an extensive 18 months technical refit
      • Accommodation for 22 guests in a 10+1 cabins layout
      • Canadian coast guard certified helipad
      • 8,000 nm range
      • EU VAT paid
1.1
Voyager interior 3
Voyager Interior 1
Voyager 009
Voyager Mediaroom
Voyager Skylounge 1
Voyager Master
Voyager Master Bath 18
Voyager Queen Cabin II 10-2020
Voyager Red King 036
Voyager 42
Voyager Guest Blue
Voyager 43
Voyager Bunkbed twin 035
RWG07881
1613916590662
4
RWG07856
IMG_0659
RWG07860
RWG07850
IMG_0696
IMG_0676
IMG_0685
IMG_0670
1
11
IMG_9547
1.3
1.6
5
8
Voyager Yacht - General Arrangement Rev 08112020
Proud Member of