LOA 48M 157’06” Beam 8.66M 28’05” Draft 3.29M 10’10” Builder Sterling Year Built/Refit 1983 / 2006 Hull Carbon Fibre Reinforced Alloy Superstructure Fibre glass Flag St Vincent and the Grenadines Classification ABS Speed (max/cruise) 14 / 10 knots Gross Tonnage 540 tonnes Net Tonnage 162 tonnes Range 4,000nm approx. Guest Accommodation 18 guests in 8 cabins Crew Accommodation 15 crew members Main Engines 2 x Caterpillar 3512TA V12 775KW Diesels Generators 2 x Caterpillar 3406T 225HP Diesels 415 V 3 Phase 220 V Single Phase Stabilizers Naiad Anti-Roll Model 525 Water makers Sea Recovery (2 units) 5,300L & 6,814L per day Navigation Electronics Furuno Bow Thrusters Side power Auto Pilot, Furuno Radar, AIS, Magnetic Compass, Gyro Compass, VHF Radio, Chart Plotter, GPS and Echo Sounder. Fuel 83,000 Litres Fresh Water 35,000 Litres Water maker 12,000 Litres/Day MAIN DECK Main Saloon, Bar Counter, Dining Area, Main Galley Master Stateroom and VIP Room, both with Ensuite Bathrooms LOWER DECK Six Guest Rooms UPPER DECK Wheelhouse, Chart Room and Study Room SUN DECK Helipad, 2 Nos Davit, Tenders and Jet Ski Seatel Antenna - Astro Computerised Karaoke Sound System MP3 Music System 4 Nos Life Raft, Lift Buoys, Fire Extinguishers, EPIRB, EEBD, Fire Sprinklers, Portable Water Pump c/w Fire Hose etc. Fridge, Freezer and Cold Room Washing Machines and Dryer
Boston Whaler Fibre Glass Speed Boat (21 feet) with 200 HP 4 Stroke Engine Nouvurania Speed Boat (RIB) with 115HP 4 Stroke Engine Yamaha Jet Ski - Wave Runner XL 700 Stabilizers - New Naiad stabilisers was installed in October 2010.
- Model: Naiad 525 – anti roll stabilisers system with 2 new fins.
- Service and maintenance parts replaced in March 2014:
- Suction Filter Element.
- Press Filter Element.
- Cylinder Rod Seals Kit.
- Reservoir Zinc Anode.
- Case Drain Zinc Anode.
- Piston Pump.
Main Engines - Two main engines overhauled in March 2010.
- Inspection done in June 2011.
- Service and maintenance in 2015.
- ABS Bangkok – survey done on 28 Sep 2015.
Generators - Major overhauled Port & Starboard Generators (engines + alternators) – May 2015.
- Overhauled and Calibration of alternator engine ‘Woodward’ governors.
- Overhauled Port & Starboard transmission gear.
- Repair and Service Port & Starboard heat exchanger.
Interior - Upgrading works were done from time to time when necessary.
- Upgrade of 6 nos. Guest Rooms were done in Oct – Nov 2015.
- Painting of Cabinet, beds, doors and wardrobes.
- Replaced wallpaper and curtains.
- Replaced wallpaper at the corridor – lower deck.
- Replaced Roman Blinds for Main Saloon, Dining Area, Study Room and two Staterooms.
- Replaced carpet in the Study Room.
- Upgrading works were done on the Air –Conditioning System.
|